Frame inspection in Greenbank

The work is checked against the approved engineering plans.

  • Frame and trusses standing, roof sheeted, before linings
  • 1 to 2 hours on site
  • Report within 24 hours
Get a quoteDrop us your details and we will send you a quote

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookFrame and trusses standing, roof sheeted, before linings
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Greenbank frame inspection

  • Steel connections made to the engineering
  • Hanger size checked against each member
  • Laminated beams on both sides
  • Timber beams fully supported at bearings
  • Tie down bolts installed on every bracing panel
  • Tensioned and fixed strap bracing
  • Bent roof bracing nailed over
  • Timber plates anchored to concrete slabs
  • Split or damaged members
  • Plumb studs checked
  • Grout under base plates
  • Sewer and waste lines installed
  • Steel connections secure and safe
  • Crush protection plates as required
Why it matters here

Frame inspections on Greenbank builds

Many Greenbank homes combine timber framing with steel beams and columns, and the connections between them are where our frame findings gather. The timber framing does not match the approved engineer drawings. Timbers must be strong enough to support the loads placed on them. A double-sided beam with one side laminated and the other thinned at the steel post. Fit proper anchor bolts at the bracing panels and tighten any loose straps.

What we find at this stage in Greenbank

  • Mismatch between drawings and engineering
  • Small joist hangers
  • Reinforced laminated double beams
  • Missing bolts in timber bracing
  • Straps not tightened
Within the lines, recorded during a frame inspection in Greenbank
The walls follow the set out lines as required
Sample findings

Sample defects found during our frame inspections in Greenbank

Annotated findings from Frame inspections.

Appears fine from the ground, recorded during a frame inspection in Greenbank
The inspector noted the area appears fine from the ground level
Appear fine, recorded during a frame inspection in Greenbank
Slotted brackets appeared intact at the time of inspection
Within tolerance, recorded during a frame inspection in Greenbank
The timber walls were checked and found to be within the tolerance limits
Not installed, recorded during a frame inspection in Greenbank
The inspector noted that the specific item was not installed

The other stages of a Greenbank build

  1. Bored piers inspection in Greenbank1Bored piersOnce the holes are dug, before the concrete pour
  2. Slab pre-pour inspection in Greenbank2Slab pre-pourBefore the concrete arrives, once the mesh is laid
  3. Lock-up (pre-plaster) inspection in Greenbank4Lock-up (pre-plaster)Cladding, windows and rough-in complete, before plaster
  4. Fixing inspection in Greenbank5FixingJoinery, doors and trims are checked before painting begins.
  5. Waterproofing inspection in Greenbank6WaterproofingMembrane inspection before tile work
  6. Pre-handover (PCI) inspection in Greenbank7Pre-handover (PCI)Book a final inspection before handover

All construction stage inspections in Greenbank →

Guides

Construction stage guides for Greenbank

All guides →

Book a frame inspection in Greenbank

Instant online pricing for Greenbank, or contact the booking team.

FAQ

Frame inspections in Greenbank: common questions

How long is the inspector on a Greenbank frame?

The process takes one to two hours for single-storey homes and can take longer for two-storey properties with steel structures.

Does the engineering not match the approved plans?

The onsite connection does not match the drawings. The builder must ensure the work meets engineering plans and the QBCC Standards and Tolerances Guide.

Why are joist hangers important?

The mounting plate must align with the span of the structural member. The structural elements fail to meet the design requirements.

Is a recheck included?

During the handover inspection we check all open items have been secured properly.

Do you have your plans ready?

The structural plans, such as the beam schedule and bracing plan, are checked.

Does the builder try to claim that a steel joint meets the specification?

We check the build against the approved drawings to see if it matches the plans.