Insulation not packed into wall cavities
Walls trap heat and cold. If insulation is missing or loose, the house will be hard to keep comfortable.
The final check of your Greenbank home before you finish paying for it.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
Queensland Building & Construction Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society A Greenbank handover inspection checks the build against the approved drawings, engineering, the NCC and the QBCC Standards and Tolerances Guide.
34 checkpoints across 9 areas on a standard Greenbank pre-handover (PCI) inspection. We get on site when you have safe access to the land and the structure, and a builder knows an inspector is coming. We can only inspect areas we can access safely and clearly.
Recorded during the practical completion stage of new homes.











30 June 2026 · 3 min read
Walls trap heat and cold. If insulation is missing or loose, the house will be hard to keep comfortable.

11 June 2026 · 3 min read
The roof plan must match what is built on the ground, not just the builder's idea of a roof.

23 May 2026 · 3 min read
New builds in Greenbank must meet the QBCC standards.
New Construction Stage Inspections Seven inspections over a new Greenbank build, each one before the next trade arrives.
Building and Pest Inspections Building and pest inspections for Greenbank homes.
Defect Investigation Reports Assessors look closely at the site and compare findings with approved plans and standards.
Pre-Purchase Building Inspections A visual AS 4349.1 inspection for established Greenbank homes.
Dilapidation Reports Check the foundation works before the builder pours concrete.
QCAT Expert Witness Reports Tribunal-ready expert reports for disputes at QCAT.
Pre-Sale Inspections Find defects before the handover inspection and avoid paying for repairs later.
Apartment and Strata Inspections Your new home and the landscaping you can see around the house. Instant online pricing for Greenbank, or contact the booking team.
The render is applied late in the build. It can cover weep holes, bridge movement joints and hide where a joint was left out. These faults are simple to fix now but become difficult to notice later.
Tiles are fixed with dots of adhesive rather than full coverage. The tiles sound hollow when tapped and are prone to cracking. Water can also pool in the spaces beneath the tiles.
No testing of electrical, gas or plumbing systems. Appliances and air conditioning are not commissioned. We do not dismantle or cut into walls or roofing. Switchboards and wiring are the responsibility of a licensed electrician.